Biblioteca Virtual

Desarrollo de un sistema de indicadores de desempeño aplicado a una Unidad Administradora de Proyectos

Mostrar el registro sencillo del ítem

dc.contributor.advisor Bergese, Melisa
dc.contributor.author Malfante, María Celeste
dc.contributor.other Soriano, Diego
dc.contributor.other Puccio, José
dc.contributor.other Demonte, Norberto
dc.date.accessioned 2024-04-16T15:17:50Z
dc.date.available 2024-04-16T15:17:50Z
dc.date.issued 2024-03-21
dc.identifier.uri https://hdl.handle.net/11185/7550
dc.description Fil: Malfante, María Celeste. Universidad Nacional del Litoral. Facultad de Ciencias Económicas; Argentina. es_ES
dc.description.abstract El presente trabajo tiene por objetivo la elaboración de un sistema de indicadores de desempeño aplicado a la Unidad Administradora de Proyecto (UAP) de una Universidad Pública Nacional. La UAP es la encargada de la administración de proyectos de investigación financiados mayoritariamente por el Fondo Nacional de Ciencia y Tecnología (FONCyT), pero también por fondos recibido de la Secretaría de Ciencia, Tecnología e Innovación (SCTeI) de la provincia de Santa Fe y de la Secretaría de Ciencias Arte y Tecnología (SCAyT) de la Universidad Nacional del Litoral. En una primera parte, se plantea la problemática a tratar y se establecen los objetivos a alcanzar. Luego, se procede a revisar los antecedentes relacionados con la evolución del Cuadro de Mando Integral (CMI) y su adaptación al ámbito del sector público. Si bien el enfoque del trabajo no tiene como fin el desarrollo de un CMI, se nutre de sus principios para la creación del sistema de indicadores de desempeño. En el apartado siguiente, se detalla la metodología utilizada, seguido por un análisis del marco teórico. En esta etapa se exploran conceptos y procedimientos a seguir para poder llegar a la elaboración de sistema de indicadores de desempeño. Finalmente, se presenta el marco práctico en el cual se aplica el conocimiento teórico previamente establecido, con el propósito de concretar la creación del sistema de indicadores de desempeño para la UAP. En esta fase, se documentan los resultados obtenidos y se exponen las conclusiones derivadas del estudio. es_ES
dc.description.abstract The objective of this work is the development of a system of performance indicators applied to the Project Administration Unit (UAP) of a National Public University. The UAP is in charge of the administration of research projects financed mainly by the National Fund for Science and Technology (FONCyT), but also by funds received from the Secretariat of Science, Technology and Innovation (SCTeI) of the province of Santa Fe and from the Secretariat of Sciences, Art and Technology (SCAyT) of the National University of the Litoral. In the first part, the problem to be treated is posed and the objectives to be achieved are established. Then, we proceed to review the background related to the evolution of the Balanced Scorecard (BSC) and its adaptation to the public sector. Although the focus of the work is not aimed at developing a BSC, it draws on its principles for the creation of the performance indicator system. In the following section, the methodology used is detailed, followed by an analysis of the theoretical framework. In this stage, concepts and procedures to follow are explored in order to develop a system of performance indicators. Finally, the practical framework is presented in which the previously established theoretical knowledge is applied, with the purpose of specifying the creation of the performance indicator system for the UAP. In this phase, the results obtained are documented and the conclusions derived from the study are presented. en_EN
dc.format application/pdf
dc.language.iso spa es_ES
dc.rights info:eu-repo/semantics/openAccess
dc.rights.uri http://creativecommons.org/licenses/by-nc-nd/4.0/deed.es
dc.subject Sistema de gestión de desempeño es_ES
dc.subject Unidad Administradora de Proyectos es_ES
dc.subject Indicadores es_ES
dc.subject Sector público es_ES
dc.subject Cuadro de mando integral es_ES
dc.subject Performance management system en_EN
dc.subject Project Management Unit en_EN
dc.subject Indicators en_EN
dc.subject Public sector en_EN
dc.subject Balanced scorecard en_EN
dc.title Desarrollo de un sistema de indicadores de desempeño aplicado a una Unidad Administradora de Proyectos es_ES
dc.title.alternative Development of a system of performance indicators applied to a Project Management Unit en_EN
dc.type Thesis es_ES
dc.type info:eu-repo/semantics/other
dc.type info:ar-repo/semantics/trabajo final integrador
dc.type info:eu-repo/semantics/acceptedVersion
unl.degree.type especialización
unl.degree.name Especialización en Costos y Gestión Empresarial
unl.degree.grantor Facultad de Ciencias Económicas
unl.formato application/pdf


Ficheros en el ítem

Este ítem aparece en

Mostrar el registro sencillo del ítem

info:eu-repo/semantics/openAccess Excepto si se señala otra cosa, la licencia del ítem se describe como info:eu-repo/semantics/openAccess

Buscar en la biblioteca